Road Closures and Restrictions

◄ Back
April 6, 2026 9:00 AM

Traffic Light Installation in Ronald Reagan Logistics Park Area

Two traffic signals are being installed as part of the Ronald Reagan Logistics Park, Phase II project.

One will be located at US 136 and Harper Collins Way. The other will be located at Ronald Reagan Parkway and Generations St. See the attached map for specific locations.

Both signals are expected to be functional on or after April 27, weather permitting. Please use caution as crews complete work in the area.

Map of future traffic signal locations at US 136/H
Facebook Twitter Email